After moving into a new house we have encountered a few problems
which has meant I have had to put the classes on hold during May. First
we found out a pipe had been leaking for the past 8 months.
All the
furniture close to the wall had to be removed. The wall was pulled down
and the pipe was fixed. For the next 2 weeks we had to wait for the wood
to dry (not a great thing as winter has hit). The wall and 2 door frames
have been replaced (that didn’t take too long…. one evening). We are just
waiting on the painter to come in and paint the walls and frames so we can put
the house back together and I can start my card classes again.
Along with the disaster in the lounge/dining area we discovered
another leak in the main bathroom. All the grout had to be taken out and
the floor left to dry. Last Friday the tiler came in to replace the
grout…. Hopefully the leak has been fixed. Thankfully this will not
affect the running of the classes.

